
﻿


{"id":120002,"date":"2023-05-13T13:01:01","date_gmt":"2023-05-13T08:01:01","guid":{"rendered":"https:\/\/adti.uz\/?p=120002"},"modified":"2023-05-15T15:59:39","modified_gmt":"2023-05-15T10:59:39","slug":"institutda-muqobil-energiya-manbalarini-ornatish-ishlari-jadal-davom-etmoqda","status":"publish","type":"post","link":"https:\/\/old.adti.uz\/en\/institutda-muqobil-energiya-manbalarini-ornatish-ishlari-jadal-davom-etmoqda\/","title":{"rendered":"INSTALLATION OF ALTERNATIVE ENERGY SOURCES ARE IN PROGRESS IN OUR INSTITUTE"},"content":{"rendered":"<p>In accordance with the implementation of the decision of the President of the Republic of Uzbekistan &#8220;On measures to accelerate the introduction of renewable energy sources and energy-saving technologies in 2023&#8221; PQ-57, large-scale works are being carried out in Andijan State Medical Institute.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-120004 size-full\" src=\"https:\/\/adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-01_12-33-56-2.jpg\" alt=\"\" width=\"1280\" height=\"960\" srcset=\"https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-01_12-33-56-2.jpg 1280w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-01_12-33-56-2-560x420.jpg 560w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-01_12-33-56-2-768x576.jpg 768w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-01_12-33-56-2-322x242.jpg 322w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/p>\n<p>So far, 190 100 kW solar photoelectric panels have been installed on the roofs of the Institute&#8217;s Information Resource Center and educational laboratory buildings. In March-August 2023 it was planned to install an additional 400 kW of solar panels on the roofs of the institute&#8217;s educational laboratory, student hostels and administrative buildings.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-120005 size-full\" src=\"https:\/\/adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_20-53-53.jpg\" alt=\"\" width=\"1280\" height=\"960\" srcset=\"https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_20-53-53.jpg 1280w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_20-53-53-560x420.jpg 560w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_20-53-53-768x576.jpg 768w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_20-53-53-322x242.jpg 322w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/p>\n<p>186 100 kW solar photoelectric panels were installed on the roof of the lecture halls of the main educational laboratory building.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-120006 size-full\" src=\"https:\/\/adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_19-22-16.jpg\" alt=\"\" width=\"1280\" height=\"960\" srcset=\"https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_19-22-16.jpg 1280w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_19-22-16-560x420.jpg 560w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_19-22-16-768x576.jpg 768w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-12_19-22-16-322x242.jpg 322w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/p>\n<p>Currently, the installation of 100 kW solar photoelectric panels on the roof of the 2nd educational laboratory building of the institute is going on.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-120007 size-full\" src=\"https:\/\/adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-03_19-54-43.jpg\" alt=\"\" width=\"1280\" height=\"960\" srcset=\"https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-03_19-54-43.jpg 1280w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-03_19-54-43-560x420.jpg 560w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-03_19-54-43-768x576.jpg 768w, https:\/\/old.adti.uz\/wp-content\/uploads\/2023\/05\/photo_2023-05-03_19-54-43-322x242.jpg 322w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/p>\n<p>The assembly works for installing 200 kW solar photoelectric panels on the roof of student hostel buildings have been completed.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>In accordance with the implementation of the decision of the President of the Republic of Uzbekistan &#8220;On measures to accelerate the introduction of renewable energy sources and energy-saving technologies in 2023&#8221; PQ-57, large-scale works are being carried out in Andijan State Medical Institute. So far, 190 100 kW solar photoelectric panels have been installed on [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":120003,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[48,46,52],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/posts\/120002"}],"collection":[{"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/comments?post=120002"}],"version-history":[{"count":1,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/posts\/120002\/revisions"}],"predecessor-version":[{"id":120047,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/posts\/120002\/revisions\/120047"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/media\/120003"}],"wp:attachment":[{"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/media?parent=120002"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/categories?post=120002"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/tags?post=120002"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}