
﻿


{"id":127050,"date":"2024-05-18T14:01:27","date_gmt":"2024-05-18T09:01:27","guid":{"rendered":"https:\/\/adti.uz\/?p=127050"},"modified":"2024-05-20T09:48:47","modified_gmt":"2024-05-20T04:48:47","slug":"rektor-yangi-oquv-binosidagi-tamirlash-va-jihozlash-ishlari-bilan-tanishdi","status":"publish","type":"post","link":"https:\/\/old.adti.uz\/en\/rektor-yangi-oquv-binosidagi-tamirlash-va-jihozlash-ishlari-bilan-tanishdi\/","title":{"rendered":"ASMI RECTOR GOT ACQUAINTED THE REPAIR AND EQUIPMENT INSTALATION WORK IN NEW EDUCATIONAL BUILDINGS"},"content":{"rendered":"<p>It was planned to build an 800-bed educational laboratory building and the Central Research Laboratory buildings of Andijan State Medical Institute According to the Decision of the President of the Republic of Uzbekistan \u2116 PQ-5154 dated 2021 and the Decision of the Cabinet of Ministers \u2116 713 dated on November 25, 2021.<\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-127052 aligncenter\" src=\"https:\/\/adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-31-560x420.jpg\" alt=\"\" width=\"560\" height=\"420\" srcset=\"https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-31-560x420.jpg 560w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-31-768x576.jpg 768w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-31-322x242.jpg 322w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-31.jpg 1280w\" sizes=\"(max-width: 560px) 100vw, 560px\" \/><\/p>\n<p>Due to the sudden increase in the number of students of the Institute a new educational building with 2000 seats was built. Currently, the building has been completely rebuilt and repair and equipment work is being carried out.<\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-127053 aligncenter\" src=\"https:\/\/adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-45-560x420.jpg\" alt=\"\" width=\"560\" height=\"420\" srcset=\"https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-45-560x420.jpg 560w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-45-768x576.jpg 768w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-45-322x242.jpg 322w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-37-45.jpg 1280w\" sizes=\"(max-width: 560px) 100vw, 560px\" \/><\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-127054 aligncenter\" src=\"https:\/\/adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-21-631x420.jpg\" alt=\"\" width=\"631\" height=\"420\" srcset=\"https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-21-631x420.jpg 631w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-21-768x511.jpg 768w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-21-322x214.jpg 322w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-21.jpg 1280w\" sizes=\"(max-width: 631px) 100vw, 631px\" \/><\/p>\n<p>Today, on May 18, rector of the Institute M. Madazimov got acquainted with the work being done in the newly completed 2000-seat educational building. The rector inspected the modern student-based equipment delivered to the building, familiarized himself with the repair processes and gave additional instructions to the officials.<\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-127055 aligncenter\" src=\"https:\/\/adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-26-560x420.jpg\" alt=\"\" width=\"560\" height=\"420\" srcset=\"https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-26-560x420.jpg 560w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-26-768x576.jpg 768w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-26-322x242.jpg 322w, https:\/\/old.adti.uz\/wp-content\/uploads\/2024\/05\/photo_2024-05-18_11-38-26.jpg 1280w\" sizes=\"(max-width: 560px) 100vw, 560px\" \/><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>It was planned to build an 800-bed educational laboratory building and the Central Research Laboratory buildings of Andijan State Medical Institute According to the Decision of the President of the Republic of Uzbekistan \u2116 PQ-5154 dated 2021 and the Decision of the Cabinet of Ministers \u2116 713 dated on November 25, 2021. Due to the [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":127051,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[48,46,52],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/posts\/127050"}],"collection":[{"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/comments?post=127050"}],"version-history":[{"count":2,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/posts\/127050\/revisions"}],"predecessor-version":[{"id":127079,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/posts\/127050\/revisions\/127079"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/media\/127051"}],"wp:attachment":[{"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/media?parent=127050"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/categories?post=127050"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.adti.uz\/en\/wp-json\/wp\/v2\/tags?post=127050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}